Zhao Zhiwei, Gao Yong, Zhang Hu. Hydraulic Simulation of Filling Process in Low Pressure Casting[J]. Special Casting & Nonferrous Alloys, 2007,(5):351-353.DOI:
低压铸造中充型过程的水模拟研究
摘要
采用水模拟试验研究了工艺参数对低压铸造充型品质的影响。结果表明
随着加压速度的增大
升压-保压阶段拐点处液面波动振幅增加;而动力粘性系数增大
波动振幅反而减小。随着加压速度的增加
无论排气孔的面积有多大
液面上升延迟时间都有增加的趋势;型腔内背压逐渐增大
液面上升延迟时间逐渐增加。液面上升延迟时间随进气阻力增加而增加
进气阻力过大明显降低充型质量。
Abstract
Effects of processing parameters on filling process in low pressure casting have been investigated by hydraulic simulation. It was revealed that with increasing the pressure-applying rate
the fluctuation of liquid surface is increased
while it is decreased with increasing the dynamical viscosity. In addition
with increasing the applying-pressure rate
the lifting-delay time of liquid surface can be raised regardless of how large of area of exhausted-pipe line. Increasing the anti-pressure in the cavity area and exhausted-pipe line section would extend the lifting-delay time of liquid surface
however
the very small section area is obviously detriment of filling process.
关键词
低压铸造水模拟铸造充型
Keywords
Low Pressure CastingHydraulic SimulationFilling Process