The defects in large section aluminum alloy perpendicular clamp in permanent mold gravity casting were analyzed.The casting defects,such as shrinkage hole,contracted cave and crack,in the castings have been effectively eliminated by vertically assembling casting and perpendicularly parting,which improves the bearing load by 30% than designed ones.The qualified rate of the product reaches 98% and the production efficiency is increased by 35%.
Related Articles
Related Author
Related Institution